Public Law 119-73 (01/23/2026)

33 U.S.C. § 1290

Annual survey

section 1375(a) of this titleThe Administrator shall annually make a survey to determine the efficiency of the operation and maintenance of treatment works constructed with grants made under this chapter, as compared to the efficiency planned at the time the grant was made. The results of such annual survey shall be included in the report required under .

June 30, 1948, ch. 758Pub. L. 92–500, § 286 Stat. 843Pub. L. 105–362, title V, § 501(d)(2)(D)112 Stat. 3284Pub. L. 107–303, title III, § 302(b)(1)116 Stat. 2361(, title II, § 210, as added , , ; amended , , ; , , .)

Editorial Notes

Amendments

Pub. L. 107–303Pub. L. 105–362, § 501(d)(2)(D)2002— repealed . See 1998 Amendment note below.

Pub. L. 105–362, § 501(d)(2)(D)section 1375(a) of this titlePub. L. 107–3031998—, which directed the substitution of “shall be reported to Congress not later than 90 days after the date of convening of each session of Congress” for “shall be included in the report required under ”, was repealed by . See Effective Date of 2002 Amendment note below.

Statutory Notes and Related Subsidiaries

Effective Date of 2002 Amendment

Pub. L. 107–30333 U.S.C. 1251Pub. L. 105–362section 302(b) of Pub. L. 107–303section 1254 of this titleAmendment by effective , and Federal Water Pollution Act ( et seq.) to be applied and administered on and after , as if amendments made by section 501(a)–(d) of had not been enacted, see , set out as a note under .