Power grid digital information technology
Smart grid regional demonstration initiative
In general
The Secretary shall establish a smart grid regional demonstration initiative (referred to in this subsection as the “Initiative”) composed of demonstration projects focused on cost-effective, advanced technologies for use in power grid sensing, communications, analysis, power flow control, visualization, distribution automation, industrial control systems, dynamic line rating systems, grid redesign, and the integration of distributed energy resources.
Goals
Demonstration projects
In general
2
Cooperation
A demonstration project under subparagraph (A) shall be carried out in cooperation with the electric utility that owns the grid facilities in the electricity control area in which the demonstration project is carried out.
Federal share of cost of technology investments
The Secretary shall provide to an electric utility described in subparagraph (B) or to other parties financial assistance for use in paying an amount equal to not more than 50 percent of the cost of qualifying advanced grid technology investments made by the electric utility or other party to carry out a demonstration project.
Ineligibility for grants
section 17386 of this titleNo person or entity participating in any demonstration project conducted under this subsection shall be eligible for grants under for otherwise qualifying investments made as part of that demonstration project.
Availability of data
The Secretary shall establish and maintain a smart grid information clearinghouse in a timely manner which will make data from smart grid demonstration projects and other sources available to the public. As a condition of receiving financial assistance under this subsection, a utility or other participant in a smart grid demonstration project shall provide such information as the Secretary may require to become available through the smart grid information clearinghouse in the form and within the timeframes as directed by the Secretary. The Secretary shall assure that business proprietary information and individual customer information is not included in the information made available through the clearinghouse.
Open protocols and standards
The Secretary shall require as a condition of receiving funding under this subsection that demonstration projects utilize open protocols and standards (including Internet-based protocols and standards) if available and appropriate.
Authorization of appropriations
Pub. L. 110–140, title XIII, § 1304121 Stat. 1786Pub. L. 111–5, div. A, title IV, § 405(1)123 Stat. 143Pub. L. 116–260, div. Z, title VIII, § 8001134 Stat. 2578(, , ; –(4), , , 144; , , .)
Editorial Notes
Amendments
Pub. L. 116–260, § 8001(1)2020—Subsec. (a). , inserted “research, development, and demonstration” before “program” in introductory provisions.
Pub. L. 116–260, § 8001(2)(A)Subsec. (b)(1). , amended par. (1) generally. Prior to amendment, text read as follows: “The Secretary shall establish a smart grid regional demonstration initiative (referred to in this subsection as the ‘Initiative’) composed of demonstration projects specifically focused on advanced technologies for use in power grid sensing, communications, analysis, and power flow control. The Secretary shall seek to leverage existing smart grid deployments.”
Pub. L. 116–260, § 8001(2)(B)Subsec. (b)(2)(F). , added subpar. (F).
Pub. L. 111–5, § 405(1)2009—Subsec. (b)(3)(A). , amended subpar. (A) generally. Prior to amendment, text read as follows: “In carrying out the initiative, the Secretary shall carry out smart grid demonstration projects in up to 5 electricity control areas, including rural areas and at least 1 area in which the majority of generation and transmission assets are controlled by a tax-exempt entity.”
Pub. L. 111–5, § 405(2)Subsec. (b)(3)(C). , amended subpar. (C) generally. Prior to amendment, text read as follows: “The Secretary shall provide to an electric utility described in subparagraph (B) financial assistance for use in paying an amount equal to not more than 50 percent of the cost of qualifying advanced grid technology investments made by the electric utility to carry out a demonstration project.”
Pub. L. 111–5, § 405(3)Subsec. (b)(3)(E), (F). , added subpars. (E) and (F).
Pub. L. 111–5, § 405(4)Subsec. (c)(2). , amended par. (2) generally. Prior to amendment, par. (2) read as follows: “to carry out subsection (b), $100,000,000 for each of fiscal years 2008 through 2012.”
Statutory Notes and Related Subsidiaries
Effective Date
section 1601 of Pub. L. 110–140section 1824 of Title 2Section effective on the date that is 1 day after , see , set out as a note under , The Congress.