Public Law 119-73 (01/23/2026)

42 U.S.C. § 3213

Annual report to Congress

(a)

In general

Not later than , and July 1 of each year thereafter, the Secretary shall submit to Congress a comprehensive and detailed annual report on the activities of the Secretary under this chapter during the most recently completed fiscal year.

(b)

Inclusions

Each report required under subsection (a) shall—
(1)
include a list of all grant recipients by State, including the projected private sector dollar to Federal dollar investment ratio for each grant recipient;
(2)
include a discussion of any private sector leveraging goal with respect to grants awarded to—
(A)
rural areas and urban economically distressed areas; and
(B)
highly distressed areas;
(3)
after the completion of a project, include the realized private sector dollar to Federal dollar investment ratio for the project; and
(4)
(A)
include a list of all of the grants provided by the Economic Development Administration for projects located in, or that primarily benefit, rural areas;
(B)
an explanation of the process used to determine how each project referred to in subparagraph (A) would benefit a rural area; and
(C)
a certification that each project referred to in subparagraph (A)—
(i)
is located in a rural area; or
(ii)
will primarily benefit a rural area.
(c)

Additional reporting

As part of the annual report to Congress of the Economic Development Administration, the Secretary shall include a report on project completions and close outs for construction awards that includes the following information on individual construction projects:
(1)
The award date of the project.
(2)
The completion date of the project.
(3)
The close out date of the project.
(4)
The total amount of the project, including non-Federal cost share and funding from other sources, including a breakdown by source.
(5)
The number of jobs anticipated to be created or retained as a result of the investment.
(d)

Public availability

Not later than the date of the submission of the report under subsection (c), the Secretary shall make the report under subsection (c) publicly available.

(e)

Additional reporting requirement

To ensure that projects are meeting expected timelines, not later than 1 year after , the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that, at a minimum—
(1)
includes an analysis of Economic Development Administration construction project timeline estimates and actual project durations; and
(2)
describes the frequency with which project timelines are delayed and the sources of those delays, including cases in which a project scope or schedule requires an award amendment.

Pub. L. 89–136, title VI, § 603Pub. L. 105–393, title I, § 102(a)112 Stat. 3614Pub. L. 108–373, title VI, § 601118 Stat. 1769Pub. L. 118–272, div. B, title II, § 2230138 Stat. 3196(, as added , , ; amended , , ; , , .)

Editorial Notes

Prior Provisions

Pub. L. 89–136, title VII, § 70379 Stat. 572Pub. L. 105–393, § 102(b)(3)A prior section 3213, , , , set forth savings provisions, prior to repeal by .

section 603 of Pub. L. 89–136section 3203 of this titlePub. L. 105–393, § 102(a)A prior was classified to prior to repeal by .

Amendments

Pub. L. 118–272, § 2230(1)(A)(i)2025—Subsec. (b)(2)(A). , inserted “areas” after “rural”.

Pub. L. 118–272, § 2230(1)(A)(ii)Subsec. (b)(4). –(C), added par. (4).

Pub. L. 118–272, § 2230(2)Subsecs. (c) to (e). , added subsecs. (c) to (e).

Pub. L. 108–3732004— designated existing provisions as subsec. (a), inserted heading, and added subsec. (b).

Statutory Notes and Related Subsidiaries

Effective Date

section 105 of Pub. L. 105–393section 3121 of this titleSection effective , see , set out as a note under .