Section text and notes
Definitions
Eligible entity
Eligible project
The term “eligible project” means a project described in subsection (c).
Program
The term “program” means the grant program established under subsection (b).
Reclamation State
43 U.S.C. 39132 Stat. 388 The term “Reclamation State” means a State or territory described in the first section of the Act of (; , chapter 1093).
Establishment
The Secretary shall establish a program to provide grants to eligible entities on a competitive basis for the planning, design, and construction of large-scale water recycling and reuse projects that provide substantial water supply and other benefits to the Reclamation States in accordance with this section.
Eligible project
Project evaluation
Priority
Federal assistance
Federal cost share
The Federal share of the cost of any project provided a grant under the program shall not exceed 25 percent of the total cost of the eligible project.
Total dollar cap
The Secretary shall not impose a total dollar cap on Federal contributions for all eligible individual projects provided a grant under the program.
Nonreimbursable funds
Any funds provided by the Secretary to an eligible entity under the program shall be considered nonreimbursable.
Funding eligibility
Environmental laws
42 U.S.C. 4321In providing a grant for an eligible project under the program, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 ( et seq.).
Guidance
Not later than 1 year after , the Secretary shall issue guidance on the implementation of the program, including guidelines for the preparation of feasibility studies or equivalent studies by eligible entities.
Reports
Annual report
At the end of each fiscal year, the Secretary shall make available on the website of the Department of the Interior an annual report that lists each eligible project for which a grant has been awarded under this section during the fiscal year.
Comptroller general
Assessment
The Comptroller General of the United States shall conduct an assessment of the administrative establishment, solicitation, selection, and justification process with respect to the funding of grants under this section.
Report
Treatment of conveyance
The Secretary shall consider the planning, design, and construction of a conveyance system for an eligible project to be eligible for grant funding under the program.
Termination of authority
The authority to carry out this section terminates on the date that is 5 years after .
Pub. L. 117–58, div. D, title IX, § 40905135 Stat. 1122 (, , .)
Editorial Notes
References in Text
Pub. L. 102–575106 Stat. 4663 section 390h of this titleThe Reclamation Wastewater and Groundwater Study and Facilities Act, referred to in subsec. (f)(4)(A), is title XVI of , , , which enacted sections 390h to 390h–15 of this title. For complete classification of this Act to the Code, see Short Title note set out under and Tables.
Pub. L. 91–19083 Stat. 852 section 4321 of Title 42The National Environmental Policy Act of 1969, referred to in subsec. (g), is , , , which is classified generally to chapter 55 (§ 4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under and Tables.
Statutory Notes and Related Subsidiaries
Wage Rate Requirements
Pub. L. 117–58section 18851 of Title 42For provisions relating to rates of wages to be paid to laborers and mechanics on projects for construction, alteration, or repair work funded under div. D or an amendment by div. D of , including authority of Secretary of Labor, see , The Public Health and Welfare.