Definitions
Major system cost reports
Reports for breach of significant or critical cost growth thresholds
If the program manager of a major system for which a report has previously been submitted under subsection (b) determines at any time during a quarter that there is reasonable cause to believe that the total acquisition cost for the major system has increased by a percentage equal to or greater than the significant cost growth threshold or critical cost growth threshold and if a report indicating an increase of such percentage or more has not previously been submitted to the Director, then the program manager shall immediately submit to the Director a major system cost report containing the information, determined as of the date of the report, required under subsection (b).
Notification to Congress of cost growth
Requirement for Major System Congressional Report
Major System Congressional Report elements
Prohibition on obligation of funds
Treatment of cost increases prior to
Requirements to use base year dollars
Any determination of a percentage increase under this section shall be stated in terms of constant base year dollars.
Form of report
Any report required to be submitted under this section may be submitted in a classified form.
July 26, 1947, ch. 343 Pub. L. 111–259, title III, § 323(a)(1)124 Stat. 2674 (, title V, § 506E, as added , , .)
Editorial Notes
Codification
section 415a–7 of this titleSection was formerly classified to prior to editorial reclassification and renumbering as this section.
Statutory Notes and Related Subsidiaries
Applicability Date of Quarterly Reports
Pub. L. 111–259, title III, § 323(a)(2)124 Stat. 2678
Major Defense Acquisition Programs
Pub. L. 111–259, title III, § 323(b)124 Stat. 2678