Projects Authorized .—
Project Methods and Funding Sources .—
Project Priorities .—
Project Activities .—
Project Coordination .—
Annual Report .—
Definitions .—
Pub. L. 117–81, div. B, title XXVIII, § 2803135 Stat. 2186 Pub. L. 118–159, div. B, title XXVIII, § 2847138 Stat. 2264 (Added , , ; amended , , .)
Editorial Notes
Amendments
Pub. L. 118–159, § 2847(a)(1)2024—, amended section catchline generally. Prior to amendment, catchline read as follows: “Stormwater management projects for installation and defense access road resilience and waterway and ecosystems conservation”.
Pub. L. 118–159, § 2847(a)(2)Subsec. (a). , amended subsec. (a) generally. Prior to amendment, text read as follows: “The Secretary concerned may carry out a stormwater management project on or related to a military installation for the purpose of—
“(1) improving military installation resilience or the resilience of a defense access road or other essential civilian infrastructure supporting the military installation; and
“(2) protecting nearby waterways and stormwater-stressed ecosystems.”
Pub. L. 118–159, § 2847(a)(3)(A)Subsec. (b). , struck out “stormwater management” before “project under this section” in introductory provisions.
Pub. L. 118–159, § 2847(a)(3)(B)Subsec. (b)(5) to (8). , (C), added par.(5) and redesignated former pars. (5) to (7) as (6) to (8), respectively.
Pub. L. 118–159, § 2847(a)(4)Subsec. (c). , amended subsec. (c) generally. Prior to amendment, text read as follows: “In selecting stormwater management projects to be carried out under this section, the Secretary concerned shall give a priority to project proposals involving the retrofitting of buildings and grounds on a military installation or retrofitting a defense access road to reduce stormwater runoff and ponding or standing water that includes the combination of stormwater runoff and water levels resulting from extreme weather conditions.”
Pub. L. 118–159, § 2847(a)(5)(A)Subsec. (d). , struck out “stormwater management” before “project” in introductory provisions.
Pub. L. 118–159, § 2847(a)(5)(B)Subsec. (d)(1). , substituted “, retention, or filtration measures to address storm water management” for “and retention measures”.
Pub. L. 118–159, § 2847(a)(5)(C)Subsec. (d)(4), (5). , added pars. (4) and (5).
Pub. L. 118–159, § 2847(a)(6)Subsec. (e). , designated existing provisions as par. (1), struck out “stormwater management” before “project carried”, substituted “section 2391, 2684,” for “section 2391(d),”, and added par. (2).
Pub. L. 118–159, § 2847(a)(7)(A)Subsec. (f)(1)(A). , struck out “stormwater management” before “projects”.
Pub. L. 118–159, § 2847(a)(7)(A)Subsec. (f)(2). , struck out “stormwater management” before “project” in introductory provisions.
Pub. L. 118–159, § 2847(a)(7)(B)Subsec. (f)(2)(B)(iii), (iv). , added cls. (iii) and (iv).
Pub. L. 118–159, § 2847(b)Subsec. (g)(4). , substituted “section 101” for “section 101(e)(8)”.
Pub. L. 118–159, § 2847(a)(8)Subsec. (g)(6). , added par. (6).