Conveyance Authority .—
Selection of Conveyee .—
Consideration .—
Contracts for Utility Services .—
Treatment of Payments .—
Additional Terms and Conditions .—
Assistance for Construction, Repair, or Replacement of Utility Systems .—
Utility System Defined .—
Conveyance of Additional Utility Infrastructure After Conveyance of a Utility System .—
Improvement of Conveyed Utility System .—
Limitation .—
Pub. L. 105–85, div. B, title XXVIII, § 2812(a)111 Stat. 1992Pub. L. 106–65, div. A, title X, § 1067(1)113 Stat. 774Pub. L. 106–398, § 1 [[div. A]114 Stat. 1654Pub. L. 108–136, div. A, title X, § 1031(a)(32)117 Stat. 1600Pub. L. 109–163, div. B, title XXVIII, § 2823(a)119 Stat. 3514–3516Pub. L. 110–417, div. B, title XXVIII, § 2813122 Stat. 4728Pub. L. 111–84, div. B, title XXVIII, § 2821123 Stat. 2664Pub. L. 112–81, div. A, title X, § 1061(21)125 Stat. 1584Pub. L. 113–66, div. B, title XXVIII, § 2813127 Stat. 1014Pub. L. 114–92, div. B, title XXVIII, § 2813129 Stat. 1175Pub. L. 115–91, div. B, title XXVIII, § 2834131 Stat. 1858Pub. L. 115–232, div. A, title III, § 312(e)132 Stat. 1710Pub. L. 116–92, div. A, title III, § 315133 Stat. 1304Pub. L. 116–283, div. A, title XVIII, § 1883(b)(2)134 Stat. 4294Pub. L. 118–31, div. B, title XXVIII, § 2811(a)137 Stat. 748Pub. L. 118–159, div. A, title XVII, § 1701(a)(29)138 Stat. 2204Pub. L. 119–60, div. B, title XXVIII, § 2842139 Stat. 1317(Added , , ; amended , div. B, title XXVIII, § 2812, , , 851; , title X, § 1087(a)(15), div. B, title XXVIII, § 2813], , , 1654A–291, 1654A–418; , , ; –(d), , ; , , ; , , ; , , ; , , ; , , ; , , ; , , ; , , ; , div. B, title XXVIII, §§ 2823(a), 2824, , , 4333; , , ; , , ; , , .)
Editorial Notes
References in Text
Section 2925(a) of this titlesection 2925 of this titlePub. L. 117–263, div. A, title III, § 314(b)(1)(B)136 Stat. 2504, referred to in subsec. (g)(4), was struck out, and a new subsec. (a) of relating to annual reports on energy performance, resilience, and readiness of Department of Defense was added, by , , .
Prior Provisions
Pub. L. 96–125, title VIII, § 804(a)(1)93 Stat. 948Pub. L. 96–418, title VIII, § 80494 Stat. 1777Pub. L. 97–22, § 11(a)(9)95 Stat. 138Pub. L. 97–99, title IX, § 90195 Stat. 1381Pub. L. 97–21496 Stat. 173section 2915 of this titleA prior section 2688, added , , ; amended , , ; , , ; , , , related to use of solar energy systems in new facilities, prior to repeal by , §§ 7(1), 12(a), , , 176, effective , and applicable to military construction projects, and to construction and acquisition of military family housing authorized before, on, or after such date. See .
Amendments
Pub. L. 119–602025—Subsec. (k). amended subsec. (k) generally. Prior to amendment, subsec. (k) related to military construction projects to carry out improvements of conveyed utility systems.
Pub. L. 118–1592024—Subsec. (g)(4). struck out “installation energy” before “report submitted”.
Pub. L. 118–312023—Subsec. (k). amended subsec. (k) generally. Prior to amendment, text read as follows: “In the case of a utility system that is conveyed under this section and that only provides utility services to a military installation, the Secretary concerned may use amounts authorized to be appropriated for military construction to improve the reliability, resilience, efficiency, physical security, or cybersecurity of the utility system.”
Pub. L. 116–283, § 1883(b)(2)2021—Subsec. (b)(2). , substituted “subsections (a), (b), (d), and (e) of section 3204” for “subsections (c) through (f) of section 2304”.
Pub. L. 116–283, § 2824Subsec. (d)(2). , substituted “The Secretary concerned” for “The Secretary of Defense, or the designee of the Secretary,” and “if the Secretary concerned” for “if the Secretary”.
Pub. L. 116–283, § 2823(a), inserted “or the renewal of such a contract” after “paragraph (1)”, substituted “the contract or contract renewal.” for “the contract.”, and inserted at end “A renewal of a contract pursuant to this paragraph may be entered into only within the last five years of the existing contract term.”
lPub. L. 116–92l2019—Subsecs. (k), (). added subsec. (k) and redesignated former subsec. (k) as ().
Pub. L. 115–232, § 312(e)(1)2018—Subsec. (d)(2). , inserted at end “The business case analysis must also demonstrate how a privatized system will operate in a manner consistent with subsection (g)(3).”
Pub. L. 115–232, § 312(e)(2)Subsec. (g)(3). , substituted “shall require” for “may require” and “consistent with energy resilience and cybersecurity requirements and associated metrics” for “consistent with energy resilience requirements and metrics”.
Pub. L. 115–912017—Subsec. (g)(3), (4). added pars. (3) and (4).
Pub. L. 114–92, § 2813(1)2015—Subsec. (j). , substituted “Conveyance of Additional” for “Construction of” in heading.
Pub. L. 114–92, § 2813(2)Subsec. (j)(1). , redesignated subpar. (B) as (A) and substituted “utility system or operation of the additional utility infrastructure by the utility or entity would be in the best interest of the Government; and” for “utility system;”, redesignated subpar. (D) as (B) and substituted “amount for” for “amount equal to the fair market value of”, and struck out former subpars. (A) and (C) which read as follows:
“(A) the additional utility infrastructure was constructed or installed after the date of the conveyance of the utility system;
“(C) the additional utility infrastructure was planned and coordinated with the entity operating the conveyed utility system; and”.
Pub. L. 113–662013—Subsec. (d)(2). inserted at end “The determination of cost effectiveness shall be made using a business case analysis that includes an independent estimate of the level of investment that should be required to maintain adequate operation of the utility system over the proposed term of the contract.”
Pub. L. 112–81, § 1061(21)(A)section 2461 of this title2011—Subsec. (a). , struck out par. (1) designation before “The Secretary of a military department” and struck out pars. (2) and (3) which related to conditions for entry into a contract to convey all or part of a utility system and conditions under which the Secretary concerned could not reconsider conversion to contractor operation under for a five-year period, respectively.
Pub. L. 112–81, § 1061(21)(B)Subsec. (d)(2). , struck out at end “The economic analysis submitted to the congressional defense committees under subsection (a)(2) for the conveyance of the utility system, or part thereof, with regard to which the utility services contract will be entered into by the Secretary concerned shall include the determination required by this paragraph, an explanation of the need for the longer term contract, and a comparison of costs between a 10-year contract and the longer-term contract.”
Pub. L. 112–81, § 1061(21)(C)Subsec. (f). , struck out subsec. (f). Prior to amendment, text read as follows: “Not later than 30 days after the end of each quarter of a fiscal year, the Secretary shall submit to the congressional defense committees a report on the conveyances made under subsection (a) during such fiscal quarter.”
Pub. L. 112–81, § 1061(21)(D)Subsec. (h). , struck out at end “The Secretary concerned shall consider any such contribution in the economic analysis required under subsection (a)(2).”
Pub. L. 111–84, § 2821(a)2009—Subsec. (a)(2)(A)(ii). , substituted “system by 10 percent of the long-term cost for provision of those utility services in the agency tender; and” for “system; and”.
Pub. L. 111–84, § 2821(b)Subsec. (a)(3). , added par. (3).
Pub. L. 110–4172008—Subsecs. (j), (k). added subsec. (j) and redesignated former subsec. (j) as (k).
Pub. L. 109–163, § 2823(a)2006—Subsec. (a). , designated existing provisions as par. (1) and added par. (2).
Pub. L. 109–163, § 2823(b)Subsec. (c)(1). , substituted “may require” for “shall require” in introductory provisions.
Pub. L. 109–163, § 2823(c)(2)Subsec. (c)(3). , redesignated subsec. (c)(3) as (d).
Pub. L. 109–163, § 2823(c)(2)Contracts for Utility ServicesSubsec. (d). , redesignated subsec. (c)(3) as (d), substituted “.—(1) Except as provided in paragraph (2), a contract” for “A contract”, “subsection (c)” for “paragraph (1)”, and “10 years” for “50 years”, and added par. (2). Former subsec. (d) redesignated (e).
Pub. L. 109–163, § 2823(c)(1)Subsec. (e). , redesignated subsec. (d) as (e). Former subsec. (e) redesignated (f).
Pub. L. 109–163, § 2823(d)(1)Subsec. (f). , struck out at end “The report shall include, for each such conveyance, an economic analysis (based upon accepted life-cycle costing procedures approved by the Secretary of Defense) demonstrating that—
“(1) the long-term economic benefit of the conveyance to the United States exceeds the long-term economic cost of the conveyance to the United States; and
“(2) the conveyance will reduce the long-term costs of the United States for utility services provided by the utility system concerned.”
Pub. L. 109–163, § 2823(c)(1), redesignated subsec. (e) as (f). Former subsec. (f) redesignated (g).
Pub. L. 109–163, § 2823(c)(1)Subsec. (g). , redesignated subsec. (f) as (g). Former subsec. (g) redesignated (h).
Pub. L. 109–163, § 2823(d)(2)Subsec. (h). , substituted “subsection (a)(2)” for “subsection (e)”.
Pub. L. 109–163, § 2823(c)(1), redesignated subsec. (g) as (h). Former subsec. (h) redesignated (i).
Pub. L. 109–163, § 2823(c)(1)Subsecs. (i), (j). , redesignated subsecs. (h) and (i) as (i) and (j), respectively.
Pub. L. 108–1362003—Subsec. (e). amended heading and text of subsec. (e) generally. Prior to amendment, text read as follows: “The Secretary concerned may not make a conveyance under subsection (a) until—
“(1) the Secretary submits to the Committee on Armed Services and the Committee on Appropriations of the Senate and the Committee on Armed Services and the Committee on Appropriations of the House of Representatives an economic analysis (based upon accepted life-cycle costing procedures approved by the Secretary of Defense) demonstrating that—
“(A) the long-term economic benefit of the conveyance to the United States exceeds the long-term economic cost of the conveyance to the United States; and
“(B) the conveyance will reduce the long-term costs of the United States for utility services provided by the utility system concerned; and
“(2) a period of 21 days has elapsed after the date on which the economic analysis is received by the committees.”
Pub. L. 106–398, § 1 [div. B, title XXVIII, § 2813(a)]2000—Subsec. (b). , designated existing provisions as par. (1) and added pars. (2) and (3).
Pub. L. 106–398, § 1 [div. B, title XXVIII, § 2813(b)]Subsec. (f). , designated existing provisions as par. (1) and added par. (2).
Pub. L. 106–398, § 1 [[div. A]Subsecs. (h) to (j). , title X, § 1087(a)(15)], redesignated subsecs. (i) and (j) as (h) and (i), respectively.
Pub. L. 106–65, § 2812(a)1999—Subsec. (c)(3). , added par. (3).
Pub. L. 106–65, § 1067(1)Subsec. (e)(1). , substituted “and the Committee on Armed Services” for “and the Committee on National Security” in introductory provisions.
Pub. L. 106–65, § 2812(c)(2)Subsec. (g). , added subsec. (g). Former subsec. (g) redesignated (i).
Pub. L. 106–65, § 2812(b)Subsec. (g)(2)(B). , substituted “Real property, easements,” for “Easements”.
Pub. L. 106–65, § 2812(c)(1)Subsecs. (h) to (j). , redesignated subsecs. (g) and (h) as (i) and (j), respectively.
Statutory Notes and Related Subsidiaries
Effective Date of 2021 Amendment
section 1883(b)(2) of Pub. L. 116–283section 1801(d) of Pub. L. 116–283section 3001 of this titleAmendment by effective , with additional provisions for delayed implementation and applicability of existing law, see , set out as a note preceding .
Sense of Congress Regarding Inclusion of Stormwater Systems and Components Within the Meaning of “Wastewater System” Under the Department of Defense Authority for Conveyance of Utility Systems
Pub. L. 114–328, div. B, title XXVIII, § 2813130 Stat. 2717